Crane lifts for Yacolt hot tubs, well pumps, and shop trusses, plus steel shops and barns raised by the same crew.
Crane service in Yacolt is acreage work almost start to finish, with steel shops and barns erected under that same single contract. Westmore lifts hot tubs and spas down long gravel driveways, sets barn and shop steel, rigs heavier equipment onto pads a flatbed cannot reach, and lands rooftop units on the shop and small commercial roofs the town does have. Homeowners and acreage owners place nearly all of the calls. What shows up is the crane, its rigging, and an operator with NCCCO certification, quoted as one thing instead of three. A 55, a 100, and a 350 ton unit stand behind that, so the class gets picked against the load and the driveway together rather than the load alone.
Town of Yacolt Public Works handles the right-of-way permit any job needs to occupy or cross a town street, and it is a separate step from the building permit the town also issues. Westmore works out which applies and files it before the crew arrives. Off the street, the questions are grade and clearance. Driveways here climb, gravel loosens under weight, and trees stand close enough to a pad that boom clearance gets planned rather than assumed. Send what the load weighs, the spot it has to reach, and one photo taken partway up the driveway looking toward the house.
Steep gravel drives and standing timber shape every plan here, and these four calls account for almost all of the work.
Driveways climb and trees stand close, so the pick goes up over the tree line and back down onto the pad.
A shop or small commercial roof gets its unit set or swapped by the same crane that lands the backyard work.
Acreage near the state forest boundary gets a shop or barn raised by the crew that erects commercial steel.
Barn and shop framing and heavier equipment get placed where a flatbed has nowhere to turn around.
Yacolt is forested foothill country at the edge of Yacolt Burn State Forest, which means driveways that climb, gravel that loosens under weight, and limbs hanging over the last stretch of the approach. Westmore chooses the setup spot from that reality rather than from a map, and will reach further with a bigger boom rather than push a truck up a grade it has no business on.
Some parcels border public land directly and sit at the end of a long private gravel road. Those get read for width, grade, and turnaround room, because a crane that cannot turn at the top has to back the whole way down. If you know where your road pinches or where the shoulder gives out, say so and the crane class is picked around it.
A barn or shop erection usually calls the crane back for a second pick once the building is standing, most often an HVAC unit going onto the new roof. Westmore runs both, so there is no second contractor to line up for the HVAC rooftop lift and no waiting on somebody else to open a date.
Yacolt is small enough that a single Public Works office handles building, fence, and right-of-way applications alike. Westmore identifies which permit a job genuinely needs and files it before the crew shows up, rather than leaving a property owner to work out which form covers a crane. That is one fewer trip into town and one fewer reason for a date to move.
Pre-engineered metal buildings and exterior finishing round out the construction side of a Yacolt project, the same scopes Westmore runs on commercial work, scaled down to a shop or barn footprint. Bring the clear span you want inside and what you plan to keep in it, and you get an answer with the ground and the access already accounted for.
A crane set among mature trees, the kind of access many Yacolt-area properties call for.
A timber-frame build on acreage property, set with a crane line rather than hand labor alone.
The same crew that runs a hot tub lift, working a residential timber job.
Call with the load weight, the address, and the date you have in mind, or send the basics below and we call back within 24 hours.
"These guys are very professional, safe and on time. We pulled my well pump and replaced it in less than an hour with everything going very smooth. Thanks Westmore!"
Google review
"I have used Westmore construction for several years now. As an Arborist, we utilize Troy, and Warren to help us with tree removals. I could not ask for a better group of guys. They are friendly, on time, honest, and hard working. They always make safety #1, and my climbers love working with them."
Google review
"Using Westmore for crane work was awesome. The team was very professional and efficient. We will be using them again in the future"
Google review
Yes. The same three machines and certified operators that cover the rest of Clark County work here. Acreage work is routine: spas set behind houses, shop and barn steel raised, equipment rigged onto pads a truck cannot back into. Note what the pick weighs and photograph the driveway, since the road in matters as much as the load.
Only when it touches a town street. Town of Yacolt Public Works issues a right-of-way use permit for occupying a street, which is separate from any building permit the work itself needs. A pick that stays behind the property line does not reach the street at all. Westmore handles the right-of-way application.
Often yes, though the driveway usually picks the machine. This is forested foothill country, so grade, width, and overhanging limbs are the obstacles more often than the load is. Equipment can set up wherever the ground is firm and work the pad from there, which is why an approach photo counts for more here than the tonnage does.
Firm level ground for outriggers and an open arc for the load. Limbs over the swing path get trimmed, vehicles and equipment move off the setup area, and the pad has to be finished. On forested acreage the setup point and the tree clearance are settled in advance, so nothing gets cut on the day of the pick.
Two things carry most of it: what has to be lifted, and what the road in will take. A long gravel drive, a grade, or a turn a loaded crane cannot make can change the equipment and the plan more than the weight does. The crane gets sized against both.
The load and the road in, together. A boom loses capacity the farther it has to reach, so a machine parked well back from the pad needs more than the weight alone suggests, and a narrow forested driveway can decide where it parks. The largest machine is rated 350 tons, the smallest 55.
Westmore, on one agreement from the drawings through the last panel. Pre-engineered buildings are raised by company crews, exterior finishing falls under the same contract, and so does the commercial general contracting that holds the permits. The machine that raises the frame belongs to the same company, so a rural build is not waiting on an outside erector.
Old community names still turn up on addresses out here, and Westmore covers all of them the same as a Yacolt address.
Describe the load, the pad it ends up on, and what the gravel driveway does on the way up. Grade and clearance decide the crane class here, so those answers come first.
Battle Ground, WA
Fields marked * are required.
We call back within 24 hours. Prefer to talk? (360) 772-1040