Crane work and clear-span steel buildings for McMinnville plants, downtown storefronts, and wine country acreage, sized to the job.
Crane and steel work in McMinnville arrives from three different customers. Downtown, on the older commercial grid around East Third Street, it is rooftop units and equipment landed from a street the City has to sign off on before anything moves. Out on the surrounding acreage it is clear-span production and storage buildings, with tanks and process equipment set once the shell is closed in. Inside the city's industrial base it is plant rigging: machinery moved, swapped or repositioned while the floor keeps working. Every lift goes out operated. The operator holds NCCCO certification, the rigging is picked to suit the load, and the fleet spans 55, 100 and 350 ton machines.
Two calendars matter more than tonnage here. The City of McMinnville Public Works Department takes an Application for Street Use and Public Right of Way Use. Its published list of covered uses names construction along with parking vehicles or storage for moving purposes, and the City states applications are due at least 45 days before the work. A signed waiver of liability comes with an approved permit, and the form wants an exact description of the closure area plus a detailed map, with downtown requests directed to the City's Downtown McMinnville Permitting Map. Near the airport corridor a tall boom can also need FAA Form 7460-1 notice on its own 45-day clock. Send a street address, a weight, and a reach.
Four kinds of call come out of Yamhill County, from a production building raised on acreage to a spa dropped behind a house in town.
Clear-span frames raised on acreage and equipment landed inside working plants, with the same company standing the frame and running the crane under one schedule.
Units swapped out over downtown storefronts and commercial roofs, planned around whatever street or lot space the setup is allowed to hold.
Tanks, process equipment and transformers rigged, flown and landed on a window the production schedule hands you, not the other way round.
Swim spas, hot tubs and saunas taken over the house and set on their pad without a fence panel coming out.
A street lift in McMinnville runs on the City's calendar. The Public Works street use application covers construction and the parking of vehicles or storage for moving purposes, and the City states applications are due at least 45 days before the work. Someone planning a downtown set who starts pricing it a week out is planning the wrong week, and hearing that early is worth more than any capacity chart.
The application asks for an exact description of the requested area and the location of the closure, plus a detailed map where more than one street or area is involved, and downtown requests are pointed at the City's own Downtown McMinnville Permitting Map. Westmore draws that exhibit and submits it, along with the signed waiver of liability the City attaches to an approved permit.
East Third Street and the blocks around it are an older, tight commercial grid, so setup room tends to pick the machine before lifting capacity does. Where the lane belongs to a state highway rather than a city street, the closure becomes an ODOT Maintenance District matter. Photographs of the frontage, the overhead lines and the swing path answer both questions at once.
Wine country building is steel building. Production space, barrel and case storage, and covered work areas all want a clear span and a door sized for equipment, which is what a pre-engineered frame does well. Westmore puts those up as the commercial general contractor, then brings the crane back to set tanks and process equipment once the shell is closed in.
Inside the city limits, McMinnville reviews its own commercial permits: new construction, additions, changes of occupancy and tenant improvements all go to the City's Building Division rather than to Yamhill County. Outside the city limits, work in the county right-of-way runs under county provisions instead. Which side of that line a parcel falls on shapes the schedule before a design is finished.
Steel buildings on the east side of town carry an airspace question too. The industrial and mixed-use ground along the Three Mile Lane corridor sits beside the city-owned airport, where a tall boom can trigger FAA Form 7460-1 notice at least 45 days before construction. Whether a given boom height reaches that threshold is set by 14 CFR 77.9, not by the City.
Steel and panel walls going up around a new frame.
Hook block and boom working over a masonry wall.
A boom raised over the treeline for a residential set.
Call with what you know so far, or send the basics below and we call back within 24 hours.
"This company does excellent crane work. I've worked with several crane companies in the past and none of them showed up as prepared as Westmore. Their crew had a great attitude, communicated well, and safely set our sign bridge in under an hour. I highly recommend Westmore Construction."
Google review
"We hired Westmore Construction to build a slant-roof metal building on our property. From the beginning, Warren and his team followed-thru on everything they promised, were always professional and friendly and always reachable on the telephone. Each day, his crew would clean up the job site before heading home and were always respectful of our property. We would highly recommend hiring them."
Google review
"Great people to work with. We have worked with both sides, the construction team and the crane services and have been absolutely amazed with the professionalism and their communication skills. We get to hire their crane fairly often for picking larger concrete vaults and they are always quick to respond with timing and pricing for each project. We wouldn't want to use anyone else!"
Google review
Yes, downtown, out on the surrounding acreage, and along the industrial ground east of town. The lead time depends on where the crane stands. A lift staged entirely on private property carries no city application at all. A lift that occupies a public street runs on the City of McMinnville street use application, which the City states is due at least 45 days before the work.
Yes, any time the crane occupies public street space. The City of McMinnville Public Works Department issues the Street Use and Public Right of Way Use permit, and its published list of covered uses names construction along with parking vehicles or storage for moving purposes. Outriggers in a travel lane fall inside that list. A signed waiver of liability comes with an approved permit.
Inside the city limits, the City of McMinnville Building Division reviews it. McMinnville runs an independent building department, so a commercial permit for new construction, an addition, a change of occupancy or a tenant improvement does not route to Yamhill County. Outside the city limits, county provisions govern work in the county right-of-way. Confirming which side of that line a parcel sits on comes first.
It works off the street space the approved closure gives it. Outriggers go down on matting where the pavement is questionable, the boom comes up over the parapet, and the unit travels from the truck bed to the roof curb in one swing. Downtown blocks are an older, tight grid, so setup room usually settles machine size ahead of capacity. The mechanical contractor takes it from there.
Yes, and the fence is rarely the problem. What matters is the corridor the tub has to travel through: overhead limbs, the height of the roof it clears, and a legal spot on the street for the truck. Send one picture shot from the spot a truck would use, looking toward the pad. The machine arrives operated, with its rigging gear aboard.
Cost tracks four variables. The weight going up, the distance the boom must cover, what the pads are bearing on, and total time on site. A street closure adds permit work and a drawn exhibit on top of those. Send the reach, the piece weight, and the address.
Newberg, Dundee, and Three Mile Lane addresses go out with the same crew and equipment as a job on East Third Street.
Tell us the load weight, the boom reach, and the McMinnville address. For a building, the drawings and the parcel address are the place to start.
Battle Ground, WA
Fields marked * are required.
We call back within 24 hours. Prefer to talk? (360) 772-1040